RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0819008714 - Archived data from Tue, 11. August 2020 17:36:29 CEST


This is all the information about APD 0819008714. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0819008714
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 201
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5610293 V     T = -25 °C: 348.4773561 V
Voltage for Gain 150: T = +20 °C: 392.4812332 V     T = -25 °C: 355.9163411 V
Voltage for Gain 200: T = +20 °C: 396.8805604 V     T = -25 °C: 360.1145497 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.666529281 V-1     T = -25 °C: 4.656968925 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.177946375 V-1     T = -25 °C: 9.282068444 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21859272 V-1     T = -25 °C: 14.45509653 V-1
Break-through voltage: T = +20 °C: 412.3081555 V     T = -25 °C: 375.5276111 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:17 CET jreher Updated box and position via API.
08. Dec 2020 17:17:52 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:29 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:39 CET jreher Updated APD location via API.
25. Nov 2019 17:26:42 CET jreher Updated box and position via API.
13. Aug 2019 14:47:10 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 11:42:25 CEST markus.moritz
22. Jun 2016 15:29:38 CEST Tobias Imported from Hamamatsu datasheet.