RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0819008706 - Archived data from Tue, 06. October 2020 16:52:32 CEST


This is all the information about APD 0819008706. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0819008706
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 200
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8631698 V     T = -25 °C: 349.9536854 V
Voltage for Gain 150: T = +20 °C: 393.7873849 V     T = -25 °C: 357.4074267 V
Voltage for Gain 200: T = +20 °C: 398.1938812 V     T = -25 °C: 361.5824738 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615564067 V-1     T = -25 °C: 4.916452174 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.041302298 V-1     T = -25 °C: 8.991665652 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01567474 V-1     T = -25 °C: 15.85359024 V-1
Break-through voltage: T = +20 °C: 414.1101333 V     T = -25 °C: 377.318959 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:14 CET jreher Updated box and position via API.
29. Jan 2021 10:27:07 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:32 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:32 CET jreher Updated APD location via API.
25. Nov 2019 17:26:40 CET jreher Updated box and position via API.
13. Aug 2019 14:46:20 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 11:09:26 CEST markus.moritz
22. Jun 2016 15:29:37 CEST Tobias Imported from Hamamatsu datasheet.