RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0819008699 - Archived data from Mon, 17. August 2020 15:53:06 CEST


This is all the information about APD 0819008699. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0819008699
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 200
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8121631 V     T = -25 °C: 345.1474982 V
Voltage for Gain 150: T = +20 °C: 388.6505983 V     T = -25 °C: 352.4835843 V
Voltage for Gain 200: T = +20 °C: 392.9969994 V     T = -25 °C: 356.593749 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.664942654 V-1     T = -25 °C: 4.905908089 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.285723536 V-1     T = -25 °C: 9.039800056 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.50174105 V-1     T = -25 °C: 16.02899151 V-1
Break-through voltage: T = +20 °C: 407.9338969 V     T = -25 °C: 371.5659736 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:14 CET jreher Updated box and position via API.
07. Oct 2020 12:16:10 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:06 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:27 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:31 CET jreher Updated APD location via API.
25. Nov 2019 17:26:40 CET jreher Updated box and position via API.
13. Aug 2019 14:46:19 CEST spankonin Updated APD batch assignment via API.
08. Aug 2019 11:03:59 CEST markus.moritz
22. Jun 2016 15:29:37 CEST Tobias Imported from Hamamatsu datasheet.