RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0819008668 - Archived data from Tue, 11. August 2020 17:40:11 CEST


This is all the information about APD 0819008668. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0819008668
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.9 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 289
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 116
Position in grid: 17
Arrival for irradiation: 11. Jun 2016
Sent for analysis after irradiation: 23. Jun 2016
Return for assembly: 11. Jul 2016
   
Irradiation:  
Date: 21. Jun 2016
Dose used: 37 Gy
Temperature: 25 °C
Position: 3
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 21. Jun 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7051442 V     T = -25 °C: 342.4600137 V
Voltage for Gain 150: T = +20 °C: 385.5884457 V     T = -25 °C: 349.7625333 V
Voltage for Gain 200: T = +20 °C: 389.958235 V     T = -25 °C: 353.8526466 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.369408854 V-1     T = -25 °C: 4.83988933 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.342818355 V-1     T = -25 °C: 9.844170804 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59482521 V-1     T = -25 °C: 15.72780569 V-1
Break-through voltage: T = +20 °C: 405.0103039 V     T = -25 °C: 368.6833003 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:34 CET jreher Updated box and position via API.
08. Dec 2020 17:17:20 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:01 CEST jreher Updated box and position via API.
11. Aug 2020 17:40:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:31 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:38 CET jreher Updated APD location via API.
25. Nov 2019 17:31:23 CET jreher Updated box and position via API.
22. Oct 2019 14:31:14 CEST spankonin Updated APD location via API.
14. Oct 2019 17:33:21 CEST jgrochowski Updated APD batch assignment via API.
03. Aug 2016 16:06:32 CEST markus.moritz Entered return for assembly date.
03. Aug 2016 16:06:18 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:06:07 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 15:24:07 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 14:12:58 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:37 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:29:36 CEST Tobias Imported from Hamamatsu datasheet.