RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0818008569 - Archived data from Wed, 03. August 2016 16:03:08 CEST


This is all the information about APD 0818008569. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0818008569
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 376
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 67
Position in grid: 16
Arrival for irradiation: 10. Jun 2016
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 20. May 2016
Dose used: 250 Gy
Temperature: -25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 20. May 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:02:54 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:36:37 CET jreher Updated box and position via API.
08. Oct 2020 18:19:17 CEST jreher Updated APD location via API.
29. Nov 2016 11:51:58 CET markus.moritz Entered return for assembly date.
04. Aug 2016 12:45:57 CEST markus.moritz Entered arrival for irradiation date.
03. Aug 2016 16:03:20 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:03:08 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 15:18:06 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 14:00:56 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:50 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:54 CEST Tobias Imported from Hamamatsu datasheet.