RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0818008567


This is all the information about APD 0818008567. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0818008567
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen (mounted in Slice)
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.4 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 67
Position in grid: 12
Arrival for irradiation: 15. May 2016
Sent for analysis after irradiation: 23. Jun 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 20. May 2016
Dose used: 250 Gy
Temperature: -25 °C
Position: 1
Bias voltage: 320 V     (connection unknown)
   
Annealing:  
Date: 20. May 2016
Temperature: 80 °C
Duration: 8 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
17. Apr 2021 01:09:53 CEST jreher Updated APD location via API.
29. Nov 2016 11:51:58 CET markus.moritz Entered return for assembly date.
04. Aug 2016 12:45:57 CEST markus.moritz Entered arrival for irradiation date.
03. Aug 2016 16:03:20 CEST markus.moritz Entered shipped after irradiation date.
03. Aug 2016 16:03:08 CEST markus.moritz Entered arrival for irradiation date.
02. Aug 2016 15:18:06 CEST christopher.l.hahn Entered annealing information.
02. Aug 2016 14:00:56 CEST markus.moritz Entered irradiation information.
01. Aug 2016 17:27:50 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:54 CEST Tobias Imported from Hamamatsu datasheet.