RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0817008498


This is all the information about APD 0817008498. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0817008498
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.1 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 79
Position in grid: 8
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 22. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 380.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
23. Aug 2017 15:52:59 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:12:08 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:56:15 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:50:38 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:15 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:53 CEST Tobias Imported from Hamamatsu datasheet.