Subdetector specification:  
Serial: 0817008483
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 78
Position in grid: 5
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 379.9 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1019315 V     T = -25 °C: 344.5246967 V
Voltage for Gain 150: T = +20 °C: 387.9975298 V     T = -25 °C: 351.9632644 V
Voltage for Gain 200: T = +20 °C: 392.3994768 V     T = -25 °C: 356.1605125 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.552961968 V-1     T = -25 °C: 4.699256121 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.92693797 V-1     T = -25 °C: 9.454928863 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.79976778 V-1     T = -25 °C: 14.78602312 V-1
Break-through voltage: T = +20 °C: 406.8960789 V     T = -25 °C: 371.8413529 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:59 CET jreher Updated box and position via API.
11. Aug 2020 17:57:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:54 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:44 CEST jreher Updated box and position via API.
19. Dec 2019 15:52:01 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:50 CET jreher Updated box and position via API.
23. Aug 2017 15:53:23 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:11:33 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:50:11 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:14 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:52 CEST Tobias Imported from Hamamatsu datasheet.