RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008470 - Archived data from Tue, 11. August 2020 17:56:41 CEST


This is all the information about APD 0816008470. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008470
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.1 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 297
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 61
Position in grid: 1
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 389.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.8833189 V     T = -25 °C: 352.9207901 V
Voltage for Gain 150: T = +20 °C: 396.8175517 V     T = -25 °C: 360.5274422 V
Voltage for Gain 200: T = +20 °C: 401.2205892 V     T = -25 °C: 364.7884566 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.591352888 V-1     T = -25 °C: 4.823452154 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.073033686 V-1     T = -25 °C: 8.7778406 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05444347 V-1     T = -25 °C: 15.29505462 V-1
Break-through voltage: T = +20 °C: 416.4234617 V     T = -25 °C: 380.5577001 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:36 CET jreher Updated box and position via API.
11. Aug 2020 17:56:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:46:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:02 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:08 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:28 CET jreher Updated box and position via API.
10. Aug 2017 15:14:55 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:54:23 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:08 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:41:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:59 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:52 CEST Tobias Imported from Hamamatsu datasheet.