RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008449 - Archived data from Tue, 11. August 2020 17:56:48 CEST


This is all the information about APD 0816008449. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008449
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.4 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 65
Position in grid: 3
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 385.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.2923445 V     T = -25 °C: 349.4662973 V
Voltage for Gain 150: T = +20 °C: 393.2478406 V     T = -25 °C: 356.9389845 V
Voltage for Gain 200: T = +20 °C: 397.6747855 V     T = -25 °C: 361.1336008 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.443727399 V-1     T = -25 °C: 4.704296719 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.684801591 V-1     T = -25 °C: 9.599992339 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.0027021 V-1     T = -25 °C: 14.89008313 V-1
Break-through voltage: T = +20 °C: 412.701619 V     T = -25 °C: 376.3067405 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:43 CET jreher Updated box and position via API.
11. Aug 2020 17:56:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:16 CEST jreher Updated box and position via API.
19. Dec 2019 15:49:36 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:35 CET jreher Updated box and position via API.
23. Aug 2017 16:06:04 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:26:10 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:54:16 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:46:04 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:05 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:52 CEST Tobias Imported from Hamamatsu datasheet.