RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008437 - Archived data from Thu, 15. April 2021 17:01:02 CEST


This is all the information about APD 0816008437. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008437
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 311
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 64
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 384.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3059285 V     T = -25 °C: 348.950798 V
Voltage for Gain 150: T = +20 °C: 392.3300508 V     T = -25 °C: 356.4370195 V
Voltage for Gain 200: T = +20 °C: 396.7925661 V     T = -25 °C: 360.6427986 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429058144 V-1     T = -25 °C: 4.911206496 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.557957666 V-1     T = -25 °C: 8.94557247 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67175494 V-1     T = -25 °C: 15.80770245 V-1
Break-through voltage: T = +20 °C: 410.7215615 V     T = -25 °C: 375.8715825 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:22:42 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:02 CEST jreher Updated box and position via API.
05. Feb 2021 11:28:35 CET jreher Updated box and position via API.
11. Aug 2020 17:59:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:36 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:29 CEST jreher Updated box and position via API.
28. Jan 2020 14:22:09 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:17 CET jreher Updated box and position via API.
23. Aug 2017 16:04:33 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:08:36 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:58 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:45:09 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:05 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:51 CEST Tobias Imported from Hamamatsu datasheet.