RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008418 - Archived data from Mon, 07. August 2017 16:53:44 CEST


This is all the information about APD 0816008418. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008418
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 2.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 311
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 63
Position in grid: 6
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:34 CET jreher Updated box and position via API.
11. Aug 2020 17:58:59 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:35 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:28 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:54 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:16 CET jreher Updated box and position via API.
23. Aug 2017 16:05:51 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:24:32 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:44:42 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:03 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:51 CEST Tobias Imported from Hamamatsu datasheet.