RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0816008403 - Archived data from Tue, 11. August 2020 17:58:56 CEST


This is all the information about APD 0816008403. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0816008403
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 310
Position in Box: 49
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 63
Position in grid: 1
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 382.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.54269 V     T = -25 °C: 347.6942034 V
Voltage for Gain 150: T = +20 °C: 391.4721111 V     T = -25 °C: 355.127607 V
Voltage for Gain 200: T = +20 °C: 395.8700183 V     T = -25 °C: 359.3194233 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.415743114 V-1     T = -25 °C: 4.654331576 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.519054258 V-1     T = -25 °C: 9.295472821 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74447852 V-1     T = -25 °C: 14.56934368 V-1
Break-through voltage: T = +20 °C: 411.3766852 V     T = -25 °C: 374.9040309 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:14:00 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:25:57 CET jreher Updated box and position via API.
05. Feb 2021 11:28:31 CET jreher Updated box and position via API.
11. Aug 2020 17:58:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:26 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:17 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:53 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:11 CET jreher Updated box and position via API.
23. Aug 2017 16:05:51 CEST markus.moritz Entered shipped after irradiation date.
09. Aug 2017 14:24:32 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:44 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:44:42 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:50 CEST Tobias Imported from Hamamatsu datasheet.