RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0815008380


This is all the information about APD 0815008380. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0815008380
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 379
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: 10579
   
Shipment:  
Grid number: 61
Position in grid: 18
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 383.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.0495781 V     T = -25 °C: 348.3688622 V
Voltage for Gain 150: T = +20 °C: 391.9997826 V     T = -25 °C: 355.8654224 V
Voltage for Gain 200: T = +20 °C: 396.4301331 V     T = -25 °C: 360.0783516 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.524243844 V-1     T = -25 °C: 4.710067271 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.816916662 V-1     T = -25 °C: 9.460233594 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.31255231 V-1     T = -25 °C: 14.71635172 V-1
Break-through voltage: T = +20 °C: 411.952375 V     T = -25 °C: 375.7808722 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Apr 2021 22:03:05 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:36:57 CET jreher Updated box and position via API.
13. Oct 2020 16:49:49 CEST vwerner Updated APD batch assignment via API.
08. Oct 2020 18:19:49 CEST jreher Updated APD location via API.
10. Aug 2017 15:14:55 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:54:23 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:08 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:41:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:59 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:50 CEST Tobias Imported from Hamamatsu datasheet.