RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0815008359 - Archived data from Tue, 21. July 2020 14:42:30 CEST


This is all the information about APD 0815008359. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0815008359
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.5 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 70
Position in grid: 5
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 374.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:51 CET jreher Updated box and position via API.
11. Aug 2020 17:56:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:30 CEST jreher Updated box and position via API.
19. Dec 2019 15:51:13 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:43 CET jreher Updated box and position via API.
10. Aug 2017 15:16:30 CEST hans-georg.zaunick Entered shipped after irradiation date.
09. Aug 2017 14:27:43 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:54:59 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:48:31 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:10 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:49 CEST Tobias Imported from Hamamatsu datasheet.