RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0815008354 - Archived data from Tue, 11. August 2020 17:56:58 CEST


This is all the information about APD 0815008354. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0815008354
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.6 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 70
Position in grid: 14
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 373.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.7966339 V     T = -25 °C: 339.2728205 V
Voltage for Gain 150: T = +20 °C: 381.6211492 V     T = -25 °C: 346.4698927 V
Voltage for Gain 200: T = +20 °C: 385.9823971 V     T = -25 °C: 350.5122672 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.702408764 V-1     T = -25 °C: 4.946751055 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.285452681 V-1     T = -25 °C: 9.235372099 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47199648 V-1     T = -25 °C: 16.5541367 V-1
Break-through voltage: T = +20 °C: 401.9425521 V     T = -25 °C: 365.8059344 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:51 CET jreher Updated box and position via API.
11. Aug 2020 17:56:58 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:30 CEST jreher Updated box and position via API.
19. Dec 2019 15:50:08 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:43 CET jreher Updated box and position via API.
10. Aug 2017 15:16:30 CEST hans-georg.zaunick Entered shipped after irradiation date.
09. Aug 2017 14:27:43 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:54:59 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:48:31 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:10 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:49 CEST Tobias Imported from Hamamatsu datasheet.