RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0814008293 - Archived data from Tue, 11. August 2020 17:56:56 CEST


This is all the information about APD 0814008293. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0814008293
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 424 V
Voltage for Gain 100 (T=+25°C): 395.1 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 299
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 69
Position in grid: 11
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 09. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 395.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 396.0649265 V     T = -25 °C: 359.4621029 V
Voltage for Gain 150: T = +20 °C: 403.921143 V     T = -25 °C: 367.0921822 V
Voltage for Gain 200: T = +20 °C: 408.2705184 V     T = -25 °C: 371.3831359 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.56895359 V-1     T = -25 °C: 4.568275417 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.080961872 V-1     T = -25 °C: 9.068110508 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13593384 V-1     T = -25 °C: 15.97511983 V-1
Break-through voltage: T = +20 °C: 422.9990603 V     T = -25 °C: 386.6060098 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:50 CET jreher Updated box and position via API.
11. Aug 2020 17:56:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:29 CEST jreher Updated box and position via API.
19. Dec 2019 15:50:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:42 CET jreher Updated box and position via API.
10. Aug 2017 15:16:13 CEST hans-georg.zaunick Entered shipped after irradiation date.
09. Aug 2017 14:26:50 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:54:47 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:47:55 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:09 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:48 CEST Tobias Imported from Hamamatsu datasheet.