RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0813008193 - Archived data from Tue, 11. August 2020 17:36:14 CEST


This is all the information about APD 0813008193. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0813008193
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 199
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6089664 V     T = -25 °C: 349.6350347 V
Voltage for Gain 150: T = +20 °C: 393.5039122 V     T = -25 °C: 357.0796204 V
Voltage for Gain 200: T = +20 °C: 397.8790915 V     T = -25 °C: 361.271163 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.386200274 V-1     T = -25 °C: 4.643067032 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.522100356 V-1     T = -25 °C: 9.322005375 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74718583 V-1     T = -25 °C: 14.58498212 V-1
Break-through voltage: T = +20 °C: 413.494239 V     T = -25 °C: 376.8074242 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 18:51:57 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:38 CET jreher Updated box and position via API.
05. Feb 2021 11:14:04 CET jreher Updated box and position via API.
11. Aug 2020 17:36:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:34 CET jreher Updated box and position via API.
13. Aug 2019 14:45:16 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 15:55:35 CEST markus.moritz
22. Jun 2016 15:26:19 CEST Tobias Imported from Hamamatsu datasheet.