RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0813008191 - Archived data from Fri, 05. February 2021 11:14:04 CET


This is all the information about APD 0813008191. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0813008191
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 199
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.3123264 V     T = -25 °C: 351.1533378 V
Voltage for Gain 150: T = +20 °C: 395.2211668 V     T = -25 °C: 358.6685456 V
Voltage for Gain 200: T = +20 °C: 399.6094569 V     T = -25 °C: 362.8698574 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.481825946 V-1     T = -25 °C: 4.817425518 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.775830918 V-1     T = -25 °C: 9.713633023 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35285531 V-1     T = -25 °C: 15.35846626 V-1
Break-through voltage: T = +20 °C: 414.4883491 V     T = -25 °C: 377.8602794 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:15:51 CET oafedulidis Assigned to capsule by script
16. Dec 2021 13:42:49 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:14:04 CET jreher Updated box and position via API.
11. Aug 2020 17:36:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:33 CET jreher Updated box and position via API.
13. Aug 2019 14:45:16 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 15:53:34 CEST markus.moritz
22. Jun 2016 15:26:19 CEST Tobias Imported from Hamamatsu datasheet.