RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0813008183 - Archived data from Tue, 11. August 2020 17:35:56 CEST


This is all the information about APD 0813008183. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0813008183
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 197
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.3855412 V     T = -25 °C: 349.6290276 V
Voltage for Gain 150: T = +20 °C: 393.2744795 V     T = -25 °C: 357.0601696 V
Voltage for Gain 200: T = +20 °C: 397.65828 V     T = -25 °C: 361.2562511 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450215385 V-1     T = -25 °C: 4.656906744 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.690801715 V-1     T = -25 °C: 9.359770018 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09281466 V-1     T = -25 °C: 14.58575931 V-1
Break-through voltage: T = +20 °C: 413.3925142 V     T = -25 °C: 376.8318025 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:46 CET jreher Updated box and position via API.
08. Dec 2020 17:17:56 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:35:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:55 CET jreher Updated APD location via API.
25. Nov 2019 17:26:22 CET jreher Updated box and position via API.
16. Aug 2019 12:21:28 CEST jreher Updated APD location via API.
09. Aug 2019 17:06:55 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 15:41:20 CEST markus.moritz
22. Jun 2016 15:26:19 CEST Tobias Imported from Hamamatsu datasheet.