RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0813008178 - Archived data from Mon, 17. August 2020 15:53:45 CEST


This is all the information about APD 0813008178. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0813008178
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 9.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 196
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3585049 V     T = -25 °C: 348.5095542 V
Voltage for Gain 150: T = +20 °C: 392.2685832 V     T = -25 °C: 355.9144528 V
Voltage for Gain 200: T = +20 °C: 396.6600574 V     T = -25 °C: 360.0812583 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.434172901 V-1     T = -25 °C: 4.702721147 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.658418314 V-1     T = -25 °C: 9.477849478 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90368492 V-1     T = -25 °C: 14.85040001 V-1
Break-through voltage: T = +20 °C: 412.392064 V     T = -25 °C: 375.5268389 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:43 CET jreher Updated box and position via API.
07. Oct 2020 12:11:10 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:45 CEST jreher Updated box and position via API.
11. Aug 2020 17:35:55 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:48 CET jreher Updated APD location via API.
25. Nov 2019 17:26:21 CET jreher Updated box and position via API.
16. Aug 2019 12:21:21 CEST jreher Updated APD location via API.
09. Aug 2019 17:06:55 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 15:38:07 CEST markus.moritz
22. Jun 2016 15:26:19 CEST Tobias Imported from Hamamatsu datasheet.