Show Hamamatsu Avalanche Photo Diode 0812008147 - Archived data from Wed, 07. October 2020 12:28:08 CEST
This is all the information about APD 0812008147. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 0812008147 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2515028679/0812008147 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | red |
Manufacturer information: | |
Wafer position: | F08 |
Break-through voltage: | 414 V |
Voltage for Gain 100 (T=+25°C): | 386.2 V |
Dark current: | 6.2 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 192 |
Position in Box: | 39 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 18. Apr 2019 |
Sent for analysis after irradiation: | 29. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 25. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 27. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 386.3675642 V T = -25 °C: 350.2334731 V |
Voltage for Gain 150: | T = +20 °C: 394.203179 V T = -25 °C: 357.7029681 V |
Voltage for Gain 200: | T = +20 °C: 398.5393564 V T = -25 °C: 361.8936382 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.439980638 V-1 T = -25 °C: 4.723072665 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.686737809 V-1 T = -25 °C: 9.508001859 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.09692543 V-1 T = -25 °C: 14.81974868 V-1 |
Break-through voltage: | T = +20 °C: 413.7702224 V T = -25 °C: 377.0879128 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:13:09 CET | jreher | Updated box and position via API. |
07. Oct 2020 12:28:08 CEST | jreher | Assigned to capsule by script |
17. Aug 2020 15:53:39 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:35:14 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 20:03:03 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:26:01 CET | jreher | Updated box and position via API. |
16. Aug 2019 12:20:37 CEST | jreher | Updated APD location via API. |
09. Aug 2019 16:25:33 CEST | jreher | Updated APD batch assignment via API. |
07. Aug 2019 15:06:13 CEST | markus.moritz | |
22. Jun 2016 15:26:18 CEST | Tobias | Imported from Hamamatsu datasheet. |