RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008134 - Archived data from Wed, 23. August 2017 15:55:25 CEST


This is all the information about APD 0812008134. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008134
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.6 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 110
Position in grid: 3
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 384.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:34:15 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:22 CEST jreher Updated box and position via API.
05. Feb 2021 11:26:13 CET jreher Updated box and position via API.
11. Aug 2020 17:56:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:28 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:18 CEST jreher Updated box and position via API.
19. Dec 2019 15:43:53 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:04 CET jreher Updated box and position via API.
23. Aug 2017 15:55:25 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:44:22 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 18:17:14 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 17:47:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:18 CEST Tobias Imported from Hamamatsu datasheet.