RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008127 - Archived data from Tue, 11. August 2020 17:56:10 CEST


This is all the information about APD 0812008127. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008127
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H11
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 390.2 V
Dark current: 3.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 110
Position in grid: 10
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 390.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.1535382 V     T = -25 °C: 354.925933 V
Voltage for Gain 150: T = +20 °C: 399.044151 V     T = -25 °C: 362.5704217 V
Voltage for Gain 200: T = +20 °C: 403.4263632 V     T = -25 °C: 366.8374205 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.509411655 V-1     T = -25 °C: 4.760743063 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.849793776 V-1     T = -25 °C: 9.561347234 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.4750121 V-1     T = -25 °C: 14.89749745 V-1
Break-through voltage: T = +20 °C: 414.9067311 V     T = -25 °C: 380.0451891 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:12 CET jreher Updated box and position via API.
11. Aug 2020 17:56:10 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:28 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:18 CEST jreher Updated box and position via API.
19. Dec 2019 15:43:53 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:04 CET jreher Updated box and position via API.
23. Aug 2017 15:55:25 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:44:22 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 18:17:15 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 17:47:02 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:17 CEST Tobias Imported from Hamamatsu datasheet.