RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008113 - Archived data from Tue, 11. August 2020 17:56:09 CEST


This is all the information about APD 0812008113. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008113
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 109
Position in grid: 5
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 381.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7599285 V     T = -25 °C: 346.1712964 V
Voltage for Gain 150: T = +20 °C: 389.6784651 V     T = -25 °C: 353.5899806 V
Voltage for Gain 200: T = +20 °C: 394.0711265 V     T = -25 °C: 357.7474259 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.654987955 V-1     T = -25 °C: 4.871410515 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.211847654 V-1     T = -25 °C: 9.912978448 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34960389 V-1     T = -25 °C: 15.70160184 V-1
Break-through voltage: T = +20 °C: 409.8898144 V     T = -25 °C: 373.5398988 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 15:53:26 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:36 CET jreher Updated box and position via API.
05. Feb 2021 11:26:11 CET jreher Updated box and position via API.
11. Aug 2020 17:56:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:27 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:17 CEST jreher Updated box and position via API.
19. Dec 2019 15:43:52 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:03 CET jreher Updated box and position via API.
23. Aug 2017 16:05:34 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:10:29 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 17:01:31 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:31 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:17 CEST Tobias Imported from Hamamatsu datasheet.