RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008102 - Archived data from Fri, 05. February 2021 11:26:10 CET


This is all the information about APD 0812008102. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008102
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 294
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 109
Position in grid: 4
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 17. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 380.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4518894 V     T = -25 °C: 344.8900122 V
Voltage for Gain 150: T = +20 °C: 388.3333694 V     T = -25 °C: 352.2631959 V
Voltage for Gain 200: T = +20 °C: 392.7101497 V     T = -25 °C: 356.4216229 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.421174415 V-1     T = -25 °C: 4.967289659 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.654772123 V-1     T = -25 °C: 9.229053497 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.96428686 V-1     T = -25 °C: 16.44601087 V-1
Break-through voltage: T = +20 °C: 408.4260778 V     T = -25 °C: 372.0079826 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:06:19 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:10 CET jreher Updated box and position via API.
11. Aug 2020 17:56:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:26 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:16 CEST jreher Updated box and position via API.
19. Dec 2019 15:43:52 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:03 CET jreher Updated box and position via API.
23. Aug 2017 16:05:34 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:10:29 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 17:01:31 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:30 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:17 CEST Tobias Imported from Hamamatsu datasheet.