RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008090 - Archived data from Tue, 11. August 2020 17:35:51 CEST


This is all the information about APD 0812008090. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008090
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2701030062/0812008090
Unit: #1167 (barcode 1309012701)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 196
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 25. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9578794 V     T = -25 °C: 347.5013713 V
Voltage for Gain 150: T = +20 °C: 390.8485095 V     T = -25 °C: 354.8878595 V
Voltage for Gain 200: T = +20 °C: 395.2383927 V     T = -25 °C: 359.0575267 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.559582131 V-1     T = -25 °C: 4.693669 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.882722361 V-1     T = -25 °C: 9.349553855 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40488457 V-1     T = -25 °C: 14.64594156 V-1
Break-through voltage: T = +20 °C: 409.1582589 V     T = -25 °C: 373.4293868 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:41 CET jreher Updated box and position via API.
11. Aug 2020 17:35:51 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:01:34 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:10 CET jreher Updated box and position via API.
27. Nov 2019 20:03:46 CET jreher Updated APD location via API.
25. Nov 2019 17:26:19 CET jreher Updated box and position via API.
16. Aug 2019 12:21:19 CEST jreher Updated APD location via API.
09. Aug 2019 17:04:56 CEST spankonin Updated APD batch assignment via API.
31. Jul 2019 15:03:16 CEST markus.moritz
22. Jun 2016 15:26:16 CEST Tobias Imported from Hamamatsu datasheet.