RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0812008089 - Archived data from Tue, 06. October 2020 16:52:03 CEST


This is all the information about APD 0812008089. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0812008089
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 196
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1620061 V     T = -25 °C: 349.4599087 V
Voltage for Gain 150: T = +20 °C: 393.0013129 V     T = -25 °C: 356.8231988 V
Voltage for Gain 200: T = +20 °C: 397.3637917 V     T = -25 °C: 360.9698084 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.48537469 V-1     T = -25 °C: 4.71325621 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.805324464 V-1     T = -25 °C: 9.474793105 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32222484 V-1     T = -25 °C: 14.86041154 V-1
Break-through voltage: T = +20 °C: 412.4738351 V     T = -25 °C: 376.169924 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:40 CET jreher Updated box and position via API.
08. Dec 2020 17:17:22 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:03 CEST jreher Updated box and position via API.
11. Aug 2020 17:35:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:03:46 CET jreher Updated APD location via API.
25. Nov 2019 17:26:19 CET jreher Updated box and position via API.
16. Aug 2019 12:21:19 CEST jreher Updated APD location via API.
09. Aug 2019 17:04:56 CEST spankonin Updated APD batch assignment via API.
31. Jul 2019 15:02:49 CEST markus.moritz
22. Jun 2016 15:26:16 CEST Tobias Imported from Hamamatsu datasheet.