RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0811008031 - Archived data from Tue, 11. August 2020 17:36:12 CEST


This is all the information about APD 0811008031. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0811008031
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 393 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 199
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 29. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 25. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 27. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.8078035 V     T = -25 °C: 356.2915836 V
Voltage for Gain 150: T = +20 °C: 400.6818491 V     T = -25 °C: 363.8830248 V
Voltage for Gain 200: T = +20 °C: 405.0374245 V     T = -25 °C: 368.1448699 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.651253292 V-1     T = -25 °C: 4.683011638 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.236783248 V-1     T = -25 °C: 9.319183627 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.45264117 V-1     T = -25 °C: 14.54016785 V-1
Break-through voltage: T = +20 °C: 419.6590789 V     T = -25 °C: 383.1736293 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:02:10 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:40 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:14:03 CET jreher Updated box and position via API.
11. Aug 2020 17:36:12 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:18 CET jreher Updated APD location via API.
25. Nov 2019 17:26:33 CET jreher Updated box and position via API.
13. Aug 2019 14:45:16 CEST spankonin Updated APD batch assignment via API.
07. Aug 2019 14:31:29 CEST markus.moritz
22. Jun 2016 15:26:15 CEST Tobias Imported from Hamamatsu datasheet.