RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0810007983 - Archived data from Tue, 11. August 2020 17:56:32 CEST


This is all the information about APD 0810007983. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0810007983
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 103
Position in grid: 9
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 380.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3588483 V     T = -25 °C: 345.2557114 V
Voltage for Gain 150: T = +20 °C: 388.2221811 V     T = -25 °C: 352.5207098 V
Voltage for Gain 200: T = +20 °C: 392.5990799 V     T = -25 °C: 356.5968275 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.490876541 V-1     T = -25 °C: 4.942170495 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.914887101 V-1     T = -25 °C: 9.276217429 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.64276835 V-1     T = -25 °C: 16.73635667 V-1
Break-through voltage: T = +20 °C: 407.7597091 V     T = -25 °C: 371.4428891 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:22:02 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:29 CET jreher Updated box and position via API.
05. Feb 2021 11:26:29 CET jreher Updated box and position via API.
11. Aug 2020 17:56:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:57 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:48 CEST jreher Updated box and position via API.
19. Dec 2019 15:47:38 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:21 CET jreher Updated box and position via API.
23. Aug 2017 15:55:38 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:43:53 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 17:01:09 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:29 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:14 CEST Tobias Imported from Hamamatsu datasheet.