RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0810007973 - Archived data from Fri, 27. August 2021 11:14:05 CEST


This is all the information about APD 0810007973. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0810007973
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 103
Position in grid: 12
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 383.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3147017 V     T = -25 °C: 348.3961678 V
Voltage for Gain 150: T = +20 °C: 392.1351012 V     T = -25 °C: 355.791682 V
Voltage for Gain 200: T = +20 °C: 396.478681 V     T = -25 °C: 359.9271682 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502547986 V-1     T = -25 °C: 4.784557142 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.904512134 V-1     T = -25 °C: 9.689315043 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.66593984 V-1     T = -25 °C: 15.36593044 V-1
Break-through voltage: T = +20 °C: 411.8669143 V     T = -25 °C: 375.3504017 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:43:52 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:05 CEST oafedulidis Updated box and position via API.
21. Apr 2021 14:48:05 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:29 CET jreher Updated box and position via API.
11. Aug 2020 17:56:31 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:57 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:48 CEST jreher Updated box and position via API.
19. Dec 2019 15:47:37 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:20 CET jreher Updated box and position via API.
23. Aug 2017 15:55:38 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:43:53 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 17:01:09 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:29 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:14 CEST Tobias Imported from Hamamatsu datasheet.