RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0810007933 - Archived data from Tue, 11. August 2020 17:56:25 CEST


This is all the information about APD 0810007933. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0810007933
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 2.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 295
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 101
Position in grid: 18
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 380.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.247698 V     T = -25 °C: 344.6121045 V
Voltage for Gain 150: T = +20 °C: 388.132838 V     T = -25 °C: 352.024176 V
Voltage for Gain 200: T = +20 °C: 392.527288 V     T = -25 °C: 356.2131869 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.442722042 V-1     T = -25 °C: 5.013605798 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.705355406 V-1     T = -25 °C: 9.282024593 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.08477171 V-1     T = -25 °C: 14.48738889 V-1
Break-through voltage: T = +20 °C: 408.3957404 V     T = -25 °C: 372.1354288 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:23 CET jreher Updated box and position via API.
11. Aug 2020 17:56:25 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:35 CEST jreher Updated box and position via API.
19. Dec 2019 15:46:10 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:18 CET jreher Updated APD location via API.
19. Dec 2019 15:17:14 CET jreher Updated box and position via API.
23. Aug 2017 15:54:25 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 16:41:58 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:58:49 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:25 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:26:13 CEST Tobias Imported from Hamamatsu datasheet.