RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004934 - Archived data from Wed, 07. October 2020 15:44:27 CEST


This is all the information about APD 0612004934. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004934
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 418.2 V
Dark current: 15.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 31
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 418.355296 V     T = -25 °C: 381.5066936 V
Voltage for Gain 150: T = +20 °C: 426.2580762 V     T = -25 °C: 389.3308093 V
Voltage for Gain 200: T = +20 °C: 430.6342774 V     T = -25 °C: 393.6648223 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.44091412 V-1     T = -25 °C: 4.430369534 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.74679856 V-1     T = -25 °C: 8.693984594 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17934247 V-1     T = -25 °C: 15.29398207 V-1
Break-through voltage: T = +20 °C: 439.9944546 V     T = -25 °C: 409.1974659 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:24 CET jreher Updated box and position via API.
07. Oct 2020 15:44:27 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:46 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:19 CET jreher Updated APD location via API.
25. Nov 2019 17:30:23 CET jreher Updated box and position via API.
25. Nov 2019 17:23:05 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 17:07:34 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:11 CET Tobias Imported from Hamamatsu datasheet.