RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0612004911 - Archived data from Wed, 07. October 2020 15:44:24 CEST


This is all the information about APD 0612004911. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0612004911
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 454 V
Voltage for Gain 100 (T=+25°C): 425.5 V
Dark current: 16.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 257
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 425.8235567 V     T = -25 °C: 388.6613758 V
Voltage for Gain 150: T = +20 °C: 433.6597604 V     T = -25 °C: 396.5131617 V
Voltage for Gain 200: T = +20 °C: 438.0413581 V     T = -25 °C: 400.9488805 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.654066826 V-1     T = -25 °C: 4.326126983 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.852900845 V-1     T = -25 °C: 8.827207885 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37110847 V-1     T = -25 °C: 15.36341022 V-1
Break-through voltage: T = +20 °C: 439.9351474 V     T = -25 °C: 414.9428499 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:21:21 CET jreher Updated box and position via API.
07. Oct 2020 15:44:24 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:06 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:43 CEST jreher Updated box and position via API.
27. Nov 2019 20:14:16 CET jreher Updated APD location via API.
25. Nov 2019 17:30:21 CET jreher Updated box and position via API.
25. Nov 2019 15:26:49 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:11 CET Tobias Imported from Hamamatsu datasheet.