RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004893 - Archived data from Wed, 07. October 2020 15:44:32 CEST


This is all the information about APD 0611004893. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004893
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G03
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 419.5 V
Dark current: 17.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 265
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 419.8774519 V     T = -25 °C: 382.8500298 V
Voltage for Gain 150: T = +20 °C: 427.7292379 V     T = -25 °C: 390.6953277 V
Voltage for Gain 200: T = +20 °C: 432.0649711 V     T = -25 °C: 395.0261411 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.638806993 V-1     T = -25 °C: 4.663145122 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.281360286 V-1     T = -25 °C: 9.356957004 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57558891 V-1     T = -25 °C: 14.63298005 V-1
Break-through voltage: T = +20 °C: 438.584658 V     T = -25 °C: 409.2226632 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:22:30 CET jreher Updated box and position via API.
07. Oct 2020 15:44:32 CEST jreher Updated APD location via API.
11. Aug 2020 17:49:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:35:16 CEST jreher Updated box and position via API.
27. Nov 2019 20:15:31 CET jreher Updated APD location via API.
25. Nov 2019 17:30:44 CET jreher Updated box and position via API.
25. Nov 2019 17:15:49 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:11 CET Tobias Imported from Hamamatsu datasheet.