RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004880 - Archived data from Wed, 07. October 2020 15:44:02 CEST


This is all the information about APD 0611004880. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004880
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 416.6 V
Dark current: 14.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.2173497 V     T = -25 °C: 380.1102798 V
Voltage for Gain 150: T = +20 °C: 425.134671 V     T = -25 °C: 388.1608427 V
Voltage for Gain 200: T = +20 °C: 429.5415359 V     T = -25 °C: 392.4853964 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482899553 V-1     T = -25 °C: 4.664319638 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.397144304 V-1     T = -25 °C: 8.68180067 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.36257871 V-1     T = -25 °C: 15.46074566 V-1
Break-through voltage: T = +20 °C: 439.9291861 V     T = -25 °C: 407.2337088 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:34 CET jreher Updated box and position via API.
07. Oct 2020 15:44:02 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:57 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:08 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:22 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:19 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:44 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:19 CET jreher Updated APD location via API.
25. Nov 2019 17:27:20 CET jreher Updated box and position via API.
25. Nov 2019 15:23:31 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.