RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004873 - Archived data from Tue, 11. August 2020 17:43:37 CEST


This is all the information about APD 0611004873. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004873
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 455 V
Voltage for Gain 100 (T=+25°C): 427.5 V
Dark current: 14.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 205
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 427.8836887 V     T = -25 °C: 390.9290519 V
Voltage for Gain 150: T = +20 °C: 435.6790126 V     T = -25 °C: 398.7168106 V
Voltage for Gain 200: T = +20 °C: 439.463762 V     T = -25 °C: 403.0304674 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.677689279 V-1     T = -25 °C: 4.666907355 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.371953198 V-1     T = -25 °C: 9.337403346 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.04219162 V-1     T = -25 °C: 14.64787216 V-1
Break-through voltage: T = +20 °C: 440.0076937 V     T = -25 °C: 415.0165817 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:47 CET jreher Updated box and position via API.
07. Oct 2020 15:43:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:22 CET jreher Updated APD location via API.
25. Nov 2019 17:26:59 CET jreher Updated box and position via API.
25. Nov 2019 15:22:12 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.