RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0611004861 - Archived data from Wed, 07. October 2020 15:43:57 CEST


This is all the information about APD 0611004861. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0611004861
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.5 V
Dark current: 32.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 205
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.1766798 V     T = -25 °C: 379.0087028 V
Voltage for Gain 150: T = +20 °C: 424.0316539 V     T = -25 °C: 386.8111049 V
Voltage for Gain 200: T = +20 °C: 428.3658426 V     T = -25 °C: 391.1130488 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.544019114 V-1     T = -25 °C: 4.629234209 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.060770742 V-1     T = -25 °C: 9.387004325 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26125904 V-1     T = -25 °C: 14.77760616 V-1
Break-through voltage: T = +20 °C: 439.9857799 V     T = -25 °C: 405.9977849 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:45 CET jreher Updated box and position via API.
07. Oct 2020 15:43:57 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:35 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:21 CET jreher Updated APD location via API.
25. Nov 2019 17:26:58 CET jreher Updated box and position via API.
25. Nov 2019 15:22:11 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.