RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0610004831 - Archived data from Wed, 07. October 2020 15:44:07 CEST


This is all the information about APD 0610004831. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0610004831
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 442 V
Voltage for Gain 100 (T=+25°C): 414 V
Dark current: 15.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 246
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 413.220867 V     T = -25 °C: 376.3096367 V
Voltage for Gain 150: T = +20 °C: 421.1068594 V     T = -25 °C: 384.1044559 V
Voltage for Gain 200: T = +20 °C: 425.4671302 V     T = -25 °C: 388.4198061 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.550874532 V-1     T = -25 °C: 4.538536422 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.979819254 V-1     T = -25 °C: 9.085032115 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0405504 V-1     T = -25 °C: 14.26373319 V-1
Break-through voltage: T = +20 °C: 439.9461681 V     T = -25 °C: 403.8220123 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:57 CET jreher Updated box and position via API.
07. Oct 2020 15:44:07 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:09 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:50 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:29 CET jreher Updated APD location via API.
25. Nov 2019 17:33:19 CET jreher Updated box and position via API.
25. Nov 2019 15:26:07 CET spankonin Updated APD batch assignment via API.
25. Nov 2019 15:20:10 CET Tobias Imported from Hamamatsu datasheet.