RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0617005278 - Archived data from Wed, 07. October 2020 15:44:10 CEST


This is all the information about APD 0617005278. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0617005278
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 419.9 V
Dark current: 16.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 246
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.1050755 V     T = -25 °C: 383.5872756 V
Voltage for Gain 150: T = +20 °C: 428.028511 V     T = -25 °C: 391.4013281 V
Voltage for Gain 200: T = +20 °C: 432.4221885 V     T = -25 °C: 395.7265471 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533638339 V-1     T = -25 °C: 4.405091569 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.93474338 V-1     T = -25 °C: 8.718132955 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.89824074 V-1     T = -25 °C: 15.29284643 V-1
Break-through voltage: T = +20 °C: 440.00824 V     T = -25 °C: 410.9611061 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:00 CET jreher Updated box and position via API.
07. Oct 2020 15:44:10 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:14 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:52 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:32 CET jreher Updated APD location via API.
25. Nov 2019 17:33:21 CET jreher Updated box and position via API.
21. Nov 2019 16:52:53 CET spankonin Updated APD location via API.
21. Nov 2019 16:44:12 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:41 CEST Tobias Imported from Hamamatsu datasheet.