RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0617005270 - Archived data from Tue, 11. August 2020 17:48:13 CEST


This is all the information about APD 0617005270. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0617005270
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F01
Break-through voltage: 441 V
Voltage for Gain 100 (T=+25°C): 415.5 V
Dark current: 11.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 246
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.3804418 V     T = -25 °C: 379.3095942 V
Voltage for Gain 150: T = +20 °C: 424.3444471 V     T = -25 °C: 387.1781305 V
Voltage for Gain 200: T = +20 °C: 428.7383846 V     T = -25 °C: 391.5235137 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4216213 V-1     T = -25 °C: 4.486751797 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.697194378 V-1     T = -25 °C: 8.974689459 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32137813 V-1     T = -25 °C: 14.06046313 V-1
Break-through voltage: T = +20 °C: 439.866773 V     T = -25 °C: 403.9904336 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:59 CET jreher Updated box and position via API.
07. Oct 2020 15:44:09 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:31 CET jreher Updated APD location via API.
25. Nov 2019 17:33:20 CET jreher Updated box and position via API.
21. Nov 2019 16:52:52 CET spankonin Updated APD location via API.
21. Nov 2019 16:44:11 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:41 CEST Tobias Imported from Hamamatsu datasheet.