Serial: 0616005248
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 449 V
Voltage for Gain 100 (T=+25°C): 421.2 V
Dark current: 18.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 240
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 421.2502527 V     T = -25 °C: 384.4989592 V
Voltage for Gain 150: T = +20 °C: 429.147659 V     T = -25 °C: 392.3049153 V
Voltage for Gain 200: T = +20 °C: 433.5228038 V     T = -25 °C: 396.6361777 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.465642033 V-1     T = -25 °C: 4.430489241 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.831965387 V-1     T = -25 °C: 8.735320368 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.50202364 V-1     T = -25 °C: 15.47820194 V-1
Break-through voltage: T = +20 °C: 439.968493 V     T = -25 °C: 412.4180543 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:16 CET jreher Updated box and position via API.
11. Aug 2020 17:47:46 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:31:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:35 CET jreher Updated APD location via API.
25. Nov 2019 17:29:33 CET jreher Updated box and position via API.
18. Nov 2019 18:21:21 CET spankonin Updated APD location via API.
18. Nov 2019 18:05:28 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:39 CEST Tobias Imported from Hamamatsu datasheet.