RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005207 - Archived data from Wed, 07. October 2020 15:44:05 CEST


This is all the information about APD 0616005207. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005207
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 437 V
Voltage for Gain 100 (T=+25°C): 410 V
Dark current: 11 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 409.9648306 V     T = -25 °C: 372.2806925 V
Voltage for Gain 150: T = +20 °C: 417.9976871 V     T = -25 °C: 380.2613458 V
Voltage for Gain 200: T = +20 °C: 422.4386779 V     T = -25 °C: 384.6738406 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.457352465 V-1     T = -25 °C: 4.37912688 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.698243569 V-1     T = -25 °C: 8.517552949 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.07608245 V-1     T = -25 °C: 14.71481707 V-1
Break-through voltage: T = +20 °C: 436.5500798 V     T = -25 °C: 399.5006236 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:10 CET jreher Updated box and position via API.
07. Oct 2020 15:44:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:52 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:25 CET jreher Updated APD location via API.
25. Nov 2019 17:29:29 CET jreher Updated box and position via API.
18. Nov 2019 18:20:58 CET spankonin Updated APD location via API.
18. Nov 2019 18:06:50 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:36 CEST Tobias Imported from Hamamatsu datasheet.