RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005203 - Archived data from Wed, 07. October 2020 15:44:05 CEST


This is all the information about APD 0616005203. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005203
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 438 V
Voltage for Gain 100 (T=+25°C): 410 V
Dark current: 14 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.9512804 V     T = -25 °C: 373.2362239 V
Voltage for Gain 150: T = +20 °C: 418.9964811 V     T = -25 °C: 381.2238737 V
Voltage for Gain 200: T = +20 °C: 423.4534766 V     T = -25 °C: 385.6386447 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.504669474 V-1     T = -25 °C: 4.426570216 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.767916061 V-1     T = -25 °C: 8.610279616 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.34407525 V-1     T = -25 °C: 15.04219568 V-1
Break-through voltage: T = +20 °C: 438.2916003 V     T = -25 °C: 400.8423055 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:09 CET jreher Updated box and position via API.
07. Oct 2020 15:44:05 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:37 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:25 CET jreher Updated APD location via API.
25. Nov 2019 17:29:29 CET jreher Updated box and position via API.
18. Nov 2019 18:20:58 CET spankonin Updated APD location via API.
18. Nov 2019 18:06:49 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:35 CEST Tobias Imported from Hamamatsu datasheet.