RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005199 - Archived data from Tue, 11. August 2020 17:47:37 CEST


This is all the information about APD 0616005199. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005199
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 417.5 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 39
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 417.8385692 V     T = -25 °C: 380.3907967 V
Voltage for Gain 150: T = +20 °C: 425.812677 V     T = -25 °C: 388.3373954 V
Voltage for Gain 200: T = +20 °C: 430.2145816 V     T = -25 °C: 392.7197081 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.58467134 V-1     T = -25 °C: 4.41662202 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.049102526 V-1     T = -25 °C: 8.606675936 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1041125 V-1     T = -25 °C: 15.01799766 V-1
Break-through voltage: T = +20 °C: 440.0154828 V     T = -25 °C: 408.3163135 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:09 CET jreher Updated box and position via API.
07. Oct 2020 15:44:04 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:37 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:25 CET jreher Updated APD location via API.
25. Nov 2019 17:29:28 CET jreher Updated box and position via API.
18. Nov 2019 18:20:58 CET spankonin Updated APD location via API.
18. Nov 2019 18:06:49 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:35 CEST Tobias Imported from Hamamatsu datasheet.