RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005198 - Archived data from Wed, 07. October 2020 15:44:04 CEST


This is all the information about APD 0616005198. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005198
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 451 V
Voltage for Gain 100 (T=+25°C): 422.6 V
Dark current: 13.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 239
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 422.9416865 V     T = -25 °C: 385.1807938 V
Voltage for Gain 150: T = +20 °C: 430.8221563 V     T = -25 °C: 393.1603988 V
Voltage for Gain 200: T = +20 °C: 435.2963668 V     T = -25 °C: 397.5848181 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.521511358 V-1     T = -25 °C: 4.452810476 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.821895361 V-1     T = -25 °C: 8.668473666 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.6302397 V-1     T = -25 °C: 15.03885152 V-1
Break-through voltage: T = +20 °C: 439.9180082 V     T = -25 °C: 413.1640915 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:19:09 CET jreher Updated box and position via API.
07. Oct 2020 15:44:04 CEST jreher Updated APD location via API.
11. Aug 2020 17:47:36 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:30:51 CEST jreher Updated box and position via API.
27. Nov 2019 20:11:25 CET jreher Updated APD location via API.
25. Nov 2019 17:29:28 CET jreher Updated box and position via API.
18. Nov 2019 18:20:58 CET spankonin Updated APD location via API.
18. Nov 2019 18:06:49 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:35 CEST Tobias Imported from Hamamatsu datasheet.