RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0616005184 - Archived data from Wed, 07. October 2020 15:44:20 CEST


This is all the information about APD 0616005184. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0616005184
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 453 V
Voltage for Gain 100 (T=+25°C): 424.5 V
Dark current: 13.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 253
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 424.9550552 V     T = -25 °C: 387.6279135 V
Voltage for Gain 150: T = +20 °C: 432.9351433 V     T = -25 °C: 395.6043588 V
Voltage for Gain 200: T = +20 °C: 437.3624698 V     T = -25 °C: 400.0140067 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.49758437 V-1     T = -25 °C: 4.298087142 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.813897239 V-1     T = -25 °C: 9.139819941 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.35556417 V-1     T = -25 °C: 14.15634907 V-1
Break-through voltage: T = +20 °C: 439.9638416 V     T = -25 °C: 414.9684533 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:51 CET jreher Updated box and position via API.
07. Oct 2020 15:44:20 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:48 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:03 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:37 CET jreher Updated APD location via API.
25. Nov 2019 17:30:07 CET jreher Updated box and position via API.
21. Nov 2019 16:55:43 CET spankonin Updated APD location via API.
21. Nov 2019 16:37:01 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:34 CEST Tobias Imported from Hamamatsu datasheet.