RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005176 - Archived data from Wed, 07. October 2020 15:44:15 CEST


This is all the information about APD 0615005176. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005176
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 447 V
Voltage for Gain 100 (T=+25°C): 418.8 V
Dark current: 12.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 419.3457358 V     T = -25 °C: 382.4673395 V
Voltage for Gain 150: T = +20 °C: 427.2066089 V     T = -25 °C: 390.2916802 V
Voltage for Gain 200: T = +20 °C: 431.575135 V     T = -25 °C: 394.6325354 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.481122485 V-1     T = -25 °C: 4.486818227 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.924528886 V-1     T = -25 °C: 8.872564172 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88490135 V-1     T = -25 °C: 15.71924549 V-1
Break-through voltage: T = +20 °C: 440.0016177 V     T = -25 °C: 409.9983898 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:08 CET jreher Updated box and position via API.
07. Oct 2020 15:44:15 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:02 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:42 CET jreher Updated APD location via API.
25. Nov 2019 17:29:50 CET jreher Updated box and position via API.
21. Nov 2019 16:53:22 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:06 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:33 CEST Tobias Imported from Hamamatsu datasheet.