RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005161 - Archived data from Wed, 07. October 2020 15:44:14 CEST


This is all the information about APD 0615005161. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005161
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 417.5 V
Dark current: 14.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 247
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 418.0712108 V     T = -25 °C: 381.1798295 V
Voltage for Gain 150: T = +20 °C: 425.9807891 V     T = -25 °C: 389.031135 V
Voltage for Gain 200: T = +20 °C: 430.3765332 V     T = -25 °C: 393.3938802 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.519781969 V-1     T = -25 °C: 4.501242749 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.880768749 V-1     T = -25 °C: 8.912806878 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.61214531 V-1     T = -25 °C: 15.65629744 V-1
Break-through voltage: T = +20 °C: 439.9406353 V     T = -25 °C: 408.1697148 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:20:06 CET jreher Updated box and position via API.
07. Oct 2020 15:44:14 CEST jreher Updated APD location via API.
11. Aug 2020 17:48:21 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:32:01 CEST jreher Updated box and position via API.
27. Nov 2019 20:12:41 CET jreher Updated APD location via API.
25. Nov 2019 17:29:49 CET jreher Updated box and position via API.
21. Nov 2019 16:53:21 CET spankonin Updated APD location via API.
21. Nov 2019 16:42:39 CET spankonin Updated APD batch assignment via API.
18. Jun 2019 10:18:32 CEST Tobias Imported from Hamamatsu datasheet.