RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0615005154 - Archived data from Tue, 11. August 2020 17:43:59 CEST


This is all the information about APD 0615005154. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0615005154
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 448 V
Voltage for Gain 100 (T=+25°C): 419.7 V
Dark current: 13.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.0791231 V     T = -25 °C: 382.8299178 V
Voltage for Gain 150: T = +20 °C: 428.041467 V     T = -25 °C: 390.7438182 V
Voltage for Gain 200: T = +20 °C: 432.4537904 V     T = -25 °C: 395.1389622 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.467438404 V-1     T = -25 °C: 4.542316426 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.692091717 V-1     T = -25 °C: 9.019484427 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12240268 V-1     T = -25 °C: 13.95540443 V-1
Break-through voltage: T = +20 °C: 439.8538175 V     T = -25 °C: 411.1056043 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:32 CET jreher Updated box and position via API.
07. Oct 2020 15:44:01 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:59 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:07 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:23 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:19 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:43 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:18 CET jreher Updated APD location via API.
25. Nov 2019 17:27:19 CET jreher Updated box and position via API.
25. Nov 2019 15:23:30 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:52 CET spankonin Updated APD location via API.
18. Jun 2019 10:18:32 CEST Tobias Imported from Hamamatsu datasheet.